PLM for furniture and home décor.

Keep dimensions, finishes, material costs and supplier samples connected from the first design to the approved product. Develop furniture, home furnishings and homeware in one workspace, with a clear record of what changed and what still needs review.

ManyRows Home Décor & Furniture product record in light mode with connected specification fieldsClick to enlarge ↗
Current ManyRows interface · Native industry starter with fictional product data
Home Décor & Furniture · Start with the work in front of youClick to enlarge ↗

Start with the work in front of you

See the project’s products, attention items and next actions together.

Home Décor & Furniture · Follow the prototype down to its materialsClick to enlarge ↗

Follow the prototype down to its materials

Trace the desk frame, tube and panel through the same BOM your team uses for sourcing and certificate review.

Choose your starting workflow

Preview the model before applying it. Include the optional fictional examples to follow the first steps below, or begin with your own records.

Home décor development

Cushions, ceramics and decorative accessories

Develop material and color variants with explicit dimensions, supplier materials, unit packaging and physical sample corrections.

  • Four variants across cushion, vase and decorative-tray styles
  • Costed material and packaging BOMs in their price units
  • Measured samples, linked corrections and separate release inspections
First steps after applying
  1. Review the exact variant and BOM

    Open a cushion, vase or decorative-tray style and review each variant’s dimensions, material/color specification and declared revision. Inspect material and unit-packaging BOM quantities in their price units; the packaging selector does not add consumption.

  2. Record a fresh sample correction

    Open a live Décor Sample and choose Record a repeat test after a Pass or Fail. Keep its variant, packaging and previous-sample links, then record fresh dimensions, material/color findings, packaging observations, declared revisions, date and evidence. A complete current-revision passing tail resolves earlier sample work while retaining the original attempts.

  3. Approve and inspect the variant

    Continue the first-release guide, approve the intended revision and complete its required inspections. A sample pass does not approve sibling colors or satisfy release inspections.

Read the home décor starter guide

7 record types · 37 optional example records

Use this starter

Furniture Maker

A contract furniture range

Connect seating, tables and storage with category-specific specifications, shared assemblies, supplier materials and costs.

  • Nine products and nine reusable subassemblies
  • 20 materials, six finishes and supplier lead times
  • Multi-level BOMs and certificate expiry records
First steps after applying
  1. Follow a product’s structure

    Open a Product and expand its BOM through shared Sub-assemblies to supplier Materials. Inspect quantities, material units and the selected Finish.

  2. Review specification and cost

    Check the product’s category-specific dimensions and material costs. Follow a shared assembly’s usages to see which other products use it.

  3. Review certificate evidence

    Open the linked Compliance Certificates and check subject, scheme, scope and expiry. Use Project Home → Work queue to find expired evidence and concepts awaiting review.

Read the furniture certificate guide

7 record types · 117 optional example records

Use this starter

Furniture prototype development

One compact desk prototype

Start with a smaller desk concept and compare its materials and finishes before requesting engineering approval.

  • One compact desk and its frame and panel BOM
  • Two suppliers and two finish concepts
  • Concept review before engineering release
First steps after applying
  1. Open the compact desk concept

    Open the Product and inspect its frame and panel BOM. Follow the supplier Materials and compare the two Finish concepts.

  2. Review the proposed definition

    Check top thickness, edge profile, table base, quantities and supplier costs against your design brief.

  3. Request engineering review

    Open the product’s Changes & releases section and submit the intended revision for review. Use Project Home → Work queue to find the concept awaiting that work.

Read the revision and release guide

7 record types · 11 optional example records

Use this starter

The starter opens in ManyRows after sign-in or registration. Example records are fictional; your team supplies actual findings and approval decisions. Read the starter guide

Manage the details behind every finished piece.

Choose PLM around your product

Use a furniture and home décor checklist to evaluate dimensions, finish variants, shared materials, sample corrections and release evidence with one real product.

Read the workflow guide

Home décor styles and samples

Develop cushion colorways, glazed ceramics and decorative accessories with dimensions, material and packaging BOMs, and fresh linked samples after design or packaging revisions. Keep earlier observations in the history.

Read the workflow guide

Attributes by category

Organize the range in a classification tree. Seating, tables, and storage can carry their own attributes, with inherited fields in child categories.

Explore Data model

Reusable assemblies

Build BOMs from materials through sub-assemblies to finished products. Share frames, bases, and hardware across the range.

Explore Bills of materials

Sourcing and cost

Connect supplier quotes to the materials they cover. Follow cost through shared assemblies to understand its effect on finished products.

Explore Costing

Material and certificate evidence

Trace constituent mass through the BOM, retain source-based material-production CO₂e estimates, and link certificates to exact approved revisions with their scope and validity dates.

Explore Materials and certificates

Certificate date review and renewals

Search linked certificates by subject, issuer or scope. Step through expired, future-issued or incomplete dates, then choose a 30, 60 or 90-day window to plan renewals using the server’s UTC assessment.

Read the workflow guide

BOM certificate coverage

Review product, assembly and material definitions, including exact retained leaf revisions, with usable links and evidence gaps. Filter the current page, inspect captured receipts and open the exact saved certificate revision while whole-BOM totals remain visible.

Explore Materials and certificates

Find the missing links across the furniture BOM.

Find missing or expired certificate links for each product, assembly and material. Open the evidence for the revision under review.

  • See coverageKeep the whole BOM in view while reviewing individual records.
  • Find gapsLocate missing links, expired evidence and unapproved revisions.
  • Review the sourceOpen the exact product and certificate revisions behind a link.
ManyRows furniture BOM certificate coverage with whole-BOM totals, current-page finding filters, record-level findings and matching receipt controlsClick to enlarge
Desktop BOM certificate review · Fictional example data · 47 of 51 records have usable links; three records on the current page have findings

A starting point you can make your own.

Example records to connect

  • Products
  • Assemblies
  • Materials
  • Certificates

Define a model for the range you actually make. Categories, strongly typed fields, relationships, and polymorphic base types let products share common information while retaining their own specifications.

Starters are configurable examples. Adapt the record types, specifications and review criteria to your product, or begin with an empty project.

Choose an industry starter

Explore the modelling tools

Common questions

What should PLM software for furniture and home décor manage?

Start with product dimensions and finish options, reusable material and assembly BOMs, supplier costs, physical sample decisions and approved revisions. Home furnishings also need packaging specifications and evidence for the exact product being released. ManyRows connects these records so a material or finish change can be reviewed in context. Read the furniture and home décor PLM checklist

Can I use ManyRows for bespoke or made-to-order furniture?

Yes. Model the agreed dimensions, materials and finish as a specific product or variant, reuse shared assemblies and keep its drawings, BOM and sample decisions together. Review and approve that specification before release. Your team defines valid options and prices; selecting a finish does not automatically configure or price a bespoke order.

Is there a starter for cushions, ceramics and home accessories?

Choose Home décor development to start with styles, material/color variants, supplier materials, packaging and physical samples. Review each variant’s dimensions and BOM, retain failed samples and link fresh corrections, then use the existing approval and release inspections. Shared styles do not approve sibling variants.

Can I define my own product categories?

Yes. You control categories, their attributes, and the record types. Child categories can inherit attributes from their parent.

Can several products share a sub-assembly?

Yes. Model the assembly once and reference it from the BOMs that use it. Where-used shows the connected products.

How are finishes represented?

Finishes can be records connected to a product through a collection. This gives the team a shared list of the finishes offered for that product.

Can I plan furniture certificate renewals before expiry?

Yes. The furniture development guide shows recorded issue and expiry dates, date findings and days remaining. Choose a 30, 60 or 90-day renewal window using the displayed server UTC assessment. Expiry today remains within the recorded dates; missing timing stays explicit. Daily countdown changes preserve an otherwise unchanged review confirmation.

Does a certificate linked to the finished product cover its materials?

Each product, assembly and material needs its own usable link to its exact approved revision. The Certificates tab shows missing links, expired evidence and unapproved revisions across the primary BOM. Search and finding filters apply to the current page; totals and BOM structure findings still cover the whole selection. Open matching receipts to review their saved scope, dates and certificate revision.

What does confirming the certificate date review do?

It records your personal review against the displayed evidence. Recorded dates do not establish applicability to an approved product revision. Review the subject’s Certificates tab for applicability, and use change approval and release controls for formal decisions. Expired-record warnings remain visible after a review confirmation.

Where can I find pricing?

Review the plans and included capacity on the pricing page. You can start with a 7-day trial without a card.